The monopile foundation consists of two parts.

Monopile

Norther chose a monopile foundation to minimize the risk of construction delays by working with experienced monopile manufacturers.

This approach also ensured shorter production times, simplified logistics, and reduced costs.

Norther

Transition piece

The transition piece rises approximately 17.5 meters above LAT (Lowest Astronomical Tide) and connects the monopile to the turbine tower via a flange-bolt connection.